Quick contact info

Welcome to Advanced Space Providers – We specialize in providing Modular Building Solutions across all industry sectors in Ireland.

icon_widget_image Monday-Friday: 8:30am to 5:30pm icon_widget_image Unit H5, Eastway Business Park, Ballysimon Rd, Crabb's-Land, Limerick. Ireland. icon_widget_image +353 61 312 520 icon_widget_image info@advancedspaceproviders.com

Why Advanced Space Providers?

Advanced Space Providers, in partnership with DMD Modular, delivers purpose-built modular student residences—ready to move in, with high-spec finishes and eco-friendly features.

Key Benefits

Rapid Delivery – Complete fit-out in just 4–5 months, reducing student transition delays and capitalising on academic calendars.

Turnkey Units – Fully furnished and decorated with study, kitchenette, bathroom, and Wi‑Fi provisions.

Energy-Efficient & Cost‑Effective – NZEB-level insulation ensures low operational costs and environmental responsibility.

Flexible Layouts – From studios to multi‑bed units, with scalable designs for growing campuses or pop-up student hubs.

Safe & Secure – Robust steel frames, secure entry systems, and high acoustic performance for premium student living.

Modular Student Accommodation — Comfort, Speed & Sustainability

Ideal For

  • Universities, Institutes of Technology, Private Colleges
  • Local Authorities offering student hubs
  • Student accommodation developers

Why Choose Us

Our Polish-built modular units are renowned for durability and indoor comfort. With a lifespan of 40–50 years, they deliver value long after the student starts graduation.

Smart Living Brochure

Download our Smart Living brochure to learn about rapid delivery, energy-efficient design, and flexible layouts built to last 40–50 years.

The Challenge

To cope with the ever-increasing numbers at Parteen National School.

In 2015, Parteen NS began the construction of a new building, subsequently Advanced Space Providers returned to site and relocated the existing modular building to a new site within the school ground to allow construction to begin.

The modular building remained on site until the construction of the new building was completed.

The Solution

This project was a great example of the flexibility of Advanced Space Providers modular units; an initial 100sq/m building was installed during the summer period of 2007.

An increased demand in places saw a further 80sq/m extension added the following summer.

“Our new school is built with an Advanced Space Providers Modular process and for us that means..”
Parteen National School